
Please share this
CASE STUDY: Clear Collaboration Fast-Tracks Georgia Tech Football Facility Construction
Before adopting BIM software, the Barton Malow team relied on non-integrated design-to-manufacturing processes, leading to extended timelines due to paper-based or PDF reviews and delayed communications. Switching to Tekla Structures for their BIM needs allowed them to review and modify designs directly within the model, significantly reducing on-site issues and speeding up the construction process.
Latest Posts
Tekla PowerFab 2025i: New features and integrations now available
The 2025i version of Tekla® PowerFab® is now available, delivering new tools to help fabricators plan more accurately, manage projects…Join BuildingPoint Canada at the 2025 CEC Annual Fundraising Golf Tournament
Join BuildingPoint Canada and the CEC for the 2025 CEC Annual Fundraising Golf Tournament. It will be a special day…6 Hot Topics Everyone in Construction Is Talking About
The construction world has been buzzing lately, and not just from the sounds on the jobsite. There’s been a ton…